| |
|
Euroconsult Pakistan has a long list of successfully completedand ongoing projects in numourous fields like water resource management, infrustructure and buildings, project management, public health engineering, road, highway and bridges and many more.
|
|
COMPLETED PROJECTS
 |
 |
 |
 |
 |
|
WORLD BANK ASSISTED SINDH ON FARM WATER MANAGEMENT PROJECT– CONSULTANCY SERVICES FOR PROJECT IMPLEMENTATION ASSISTANCE |
|
FEASIBILITY STUDY OF 13-NOS.SMALL DAMS IN FATA (PACKAGE II) |
|
FEASIBILITY STUDY FOR PUNJAB BARRAGES REHABILITATION PROJECT PHASE-1 |
|
WORLD BANK FINANCED PUNJAB PRIVATE SECTOR GROUNDWATER DEVELOPMENT PROJECT |
|
WORLD BANK FINANCED FORDWAH-EASTERN SADIQIA SUB-SURFACE DRAINAGE PROJECT |
|
ASIAN DEVELOPMENT BANK FINANCED SECOND FLOOD PROTECTION SECTOR PROJECT (PACKAGE-B) |
|
ADB- TA - WATER RESOURCES STRATEGY STUDY |
|
WORLD BANK ASSISTED INSTITUTIONAL REFORM OF SINDH IRRIGATION AND DRAINAGE AUTHORITY PROJECT |
|
WORLD BANK FINANCED STUDY OF NARA CANAL COMMAND INSTITUTIONAL DEVELOPMENT PILOT PROJECT |
|
MARALA RAVI LINK CANAL RESTORATION AND IMPROVEMENT PROJECT |
|
NATIONAL DRAINAGE PROGRAMME |
|
PUNJAB IRRIGATION SYSTEMS REHABILITATION AND IMPROVEMENT PROJECT (PISRIP), PAKISTAN |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
ADB FUNDED – RAWALPINDI ENVIRONMENTAL IMPROVEMENT PROJECT PACKAGE B: INSTITUTIONAL AND URBAN DEVELOPMENT CONSULTANCY |
|
WORLD BANK FINANCED BUSINESS PROCESS RE-ENGINEERING & MIS CONSULTING SERVICES FOR NHA |
|
WORLD BANK ASSISTED INSTITUTIONAL REFORM OF SINDH IRRIGATION AND DRAINAGE AUTHORITY PROJECT |
|
WORLD BANK FINANCED - HUMAN RESOURCE/ CHANGE MANAGEMENT COMPONENT - PIFRA |
|
DFID FINANCED PAKISTAN FAMILY PROTECTION PROJECT |
|
EUROPEAN UNION FINANCED EDUCATION MANAGEMENT SYSTEM IN PAKISTAN |
|
GTZ FUNDED EDUCATION PROGRAM PROMOTION OF BASIC EDUCATION IN PUNJAB |
|
KFW FUNDED - CONSULTING SERVICES FOR NWFP BASIC HEALTH PROGRAM |
|
ASSESSMENT OF TRAINING NEEDS AND SCHOLARSHIPS |
|
BALOCHISTAN EDUCATION SUPPORT PROGRAM |
|
REHABILITATION OF EDUCATION SECTOR PROJECT |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
ADB FUNDED – RAWALPINDI ENVIRONMENTAL IMPROVEMENT PROJECT PACKAGE B: INSTITUTIONAL AND URBAN DEVELOPMENT CONSULTANCY |
|
ADB FUNDED - NWFP URBAN DEVELOPMENT PROJECT |
|
ADB FUNDED -PUNJAB COMMUNITY WATER SUPPLY AND SANITATION (SECTOR) PROJECT |
|
ADB FUNDED - PUNJAB RURAL WATER SUPPLY AND SANITATION PROJECT |
|
WORLD BANK FINANCED FORDWAH-EASTERN SADIQIA SUB-SURFACE DRAINAGE PROJECT |
|
FEASIBILITY STUDY FOR FUTURE ALTERNATE ROUTE OF BULK WATER SUPPLY AND LONG TERM EXPANSION OF KARACHI WATER SUPPLY SYSTEM FROM KINJHAR LAKE (K-IV) |
|
CONSULTANCY SERVICES FOR LAYING SEWER LINES IN K-BLOCK MODEL TOWN SOCIETY |
|
TOP SUPERVISION OF CONSTRUCTION OF TERTIARY DRAINS IN SIDDIQUEPUR ZONE IN LAHORE |
|
FEASIBILITY STUDIES AND URBAN MASTER PLANNING OF TEN INTERMEDIATE CITIES OF PUNJAB |
|
MIAN MIR WATER SUPPLY AND DRAINAGE PROJECT, LAHORE |
|
ENVIRONMENTAL AUDIT AND ENVIRONMENTAL ASSESSMENT OF A SEED PROCESSING PLANT AND A RESEARCH CENTRE AT KARGIL |
|
ENVIRONMENTAL ASSESSMENT OF TETRAPAK PLANT ON CLEANER TECHNOLOGIES, WASTE MINIMIZATION AND REGULATORY COMPLIANCE |
|
DESIGNING AND SUPERVISION OF WATER SUPPLY AND SEWERAGE SYSTEM FOR PIONEER HOUSING SOCIETY |
|
DESIGNING AND SUPERVISION OF WATER SUPPLY AND SEWERAGE SYSTEM FOR FEDERAL TECHNICAL HOUSING SOCIETY |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
PROJECT AND COST MANAGEMENT, PHASE I, CITIBANK KARACHI |
|
PROJECT MANAGEMENT SERVICES FOR CISCO KARACHI |
|
KARACHI CITIPLAN FEASIBILITY AND DUE DILIGENCE PROJECT |
|
PROJECT MANAGEMENT, COST CONSULTANCY, FACILITIES CONSULTANCY AND MOVE MANAGEMENT OF THE ESTABLISHMENT OF CISCO OFFICE IN ISLAMABAD |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
ADB FUNDED LOAN NO. 1787-PAK (SF) – NWFP BARANI AREA DEVELOPMENT PROJECT – CONSULTANCY SERVICES FOR DISTRICT LINK ROADS. (DESIGN AND CONSTRUCTION SUPERVISION OF 375 KM) |
|
ASIAN DEVELOPMENT BANK FINANCED D. G. KHAN RURAL DEVELOPMENT PROJECT – CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF 175 KM ROADS |
|
ADB FINANCED FARM-TO-MARKET ROADS NWFP PHASE-II (128 KMS) IN D.I.KHAN DISTRICT |
|
ADB QUETTA ROAD SECTOR DEVELOPMENT PROJECT RURAL ACCESS ROADS, PHASE-I (124KM ROADS) |
|
WORLD BANK FINANCED FORDWAH-EASTERN SADIQIA SUB-SURFACE DRAINAGE PROJECT |
|
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF RURAL ACCESS ROADS PROJECT PHASE I (FMR PHASE III) |
|
SUPERVISION FOR IMPROVEMENT OF KARAKORAM HIGHWAY |
|
ADB FUNDED - WIDENING AND IMPROVEMENT OF LAHORE KAHNA KASUR DUAL CARRIAGEWAY PROJECT |
|
ASIAN DEVELOPMENT BANK FINANCED D. G. KHAN RURAL DEVELOPMENT PROJECT – CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF 175 KM ROADS |
|
HYDRAULIC REVIEW REPORT ON FAILURE OF CHINIOT BRIDGE |
|
SAUJ NULLAH BRIDGE: CONSTRUCTING A NEW BRIDGE OF 350 M LONG |
|
BUNNAH NULLAH BRIDGE: CONSTRUCTING A NEW BRIDGE OF 61 M LONG |
|
HARRO RIVER BRIDGE: CONSTRUCTING A NEW BRIDGE OF 240 M LONG |
|
JHANG SARGODHA ROAD: RAISING, WIDENING AND RESURFACING OF A 40 KM SECTION |
|
JHANG SHORKOT ROAD: RAISING, WIDENING AND STRENGTHENING A 33.5 KM SECTION |
|
JHELUM CITY BUND: CONSTRUCTING A FLOOD PROTECTION EMBANKMENT ON THE RIGHT BANK FROM THE NOSE OF THE RIGHT GUIDE BANK OF THE NEW GT ROAD BRIDGE TO ABOUT 2.1 KM UPSTREAM, PROTECTING ALL JHELUM CITY |
|
PAKISTAN MOTORWAY PROJECT (M-3) COMPONENTS INCLUDE DESIGNING OF MOTORWAY WITH PROPER MEDIAN, GRADING ETC. SERVICES, CAPACITY BUILDING, BRINGING FOREIGN INVESTMENTS, PROJECT MANAGEMENT, COORDINATION, CONTRACT MANAGEMENT, SITE SUPERVISION, MATERIAL TESTING |
|
CONSTRUCTION SUPERVISION OF TOPI BYPASS ROAD IN NWFP |
|
CONSTRUCTION SUPERVISION OF ORMARA PASNI SECTION OF MAKRAN COASTAL HIGHWAY PROJECT |
|
DESIGN AND CONSTRUCTION SUPERVISION OF INDUS HIGHWAY N-55 PHASE II |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
PLANNING, DESIGN & CONSTRUCTION SUPERVISION OF SKILL DEVELOPMENT CENTRE (SDC) AT BAGH, AZAD JAMMU & KASHMIR |
|
PLANNING, DESIGN & CONSTRUCTION SUPERVISION OF SKILL DEVELOPMENT CENTRE (SDC) AT KOZA BANDA, DISTRICT BATGRAM AND KHAKI DISTRICT MANSEHRA |
|
WORLD VISION HONG KONG FUNDED – EMERGENCY EDUCATION AND SCHOOL RECONSTRUCTION IN NWFP-PAKISTAN (DESIGNING OF SEVEN (07) SCHOOLS IN TEHSIL OGHI DISTRICT MANSEHRA) |
|
WORLD VISION KOREA FUNDED – EMERGENCY EDUCATION AND SCHOOL RECONSTRUCTION IN NWFP-PAKISTAN (DESIGNING OF THREE (03) SCHOOLS IN TEHSIL OGHI DISTRICT MANSEHRA |
|
CONSULTANCY SERVICES FOR VARIOUS WORKS AT LAWRENCE COLLEGE, GHORA GALI (DESIGN OF VARIOUS BLOCKS/BUILDINGS) |
|
 |
 |
 |
 |
 |
 |
 |
|
|
ONGOING PROJECTS
 |
 |
 |
 |
 |
|
ADB FUNDED - INSTITUTIONAL STRENGTHENING CAPACITY BUILDING AND IMPROVED OPERATION, MAINTENANCE AND MANAGEMENT OF THE CANAL SYSTEM. LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP) |
|
WORLD BANK FUNDED - CAPACITY NEEDS ASSESSMENT OF MINISTRY OF WATER & POWER, PMPIU, IRSA, WAPDA AND WATER SECTION OF PLANNING COMMISSION, UNDER WCAP |
|
WORLD BANK FUNDED - CONSULTING SERVICES FOR PREPARATION OF HANDBOOK ON WATER STATISTICS OF PAKISTAN |
|
ENGINEERING CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF MAKHI FARASH LINK CANAL |
|
PLANNING, DESIGN AND CONSTRUCTION SUPERVISION OF FALL STRUCTURES AT NARA CANAL |
|
NATIONAL PROGRAMME FOR THE IMPROVEMENT OF WATERCOURSES IN SINDH- SUKKUR REGION |
|
NATIONAL PROGRAMME FOR THE IMPROVEMENT OF WATERCOURSES IN SINDH-LARKANA REGION |
|
NATIONAL PROGRAMME FOR THE IMPROVEMENT OF WATERCOURSES IN PAKISTAN – AJK |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
ADB-TA - IMPROVING EFFICIENCY AND ACCOUNTABILITY OF NORTH SINDH URBAN SERVICES CORPORATION LIMITED |
|
ADB FUNDED - CONSULTING SERVICES FOR MAPPING, PLANNING, FEASIBILITY STUDIES, DETAILED DESIGN, AND CONSTRUCTION SUPERVISION FOR NSUSC / SCIP-04 |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
DESIGN AND CONSTRUCTION OF SARGODHA MEDICAL COLLEGE, SARGODHA |
|
DESIGN AND CONSTRUCTION OF UNIVERSITY OF SCIENCE AND TECHNOLOGY (MUST) MIRPUR AJ&K |
|
PLANNING, DESIGN AND DETAILED CONSTRUCTION SUPERVISION OF DEVELOPMENT WORKS UNDER MEGA PROJECTS AT THE UNIVERSITY OF SINDH, JAMSHORO |
|
CONSULTANCY SERVICES FOR MEGA PROJECTS SINDH AGRICULTURE UNIVERSITY, TANDOJAM |
|
NHA - DESIGN/PLANNING AND CONSTRUCTION SUPERVISION OF FIVE (05) CONSTRUCTION MACHINERY TRAINING CENTERS (CMTCS) |
|
DESIGN AND CONSTRUCTION SUPERVISION OF NHA REGIONAL OFFICE BUILDING MULTAN |
|
CONSTRUCTION SUPERVISION CDTC BUILDING GUJRANWALA - TUSDEC |
|
PLANNING, DESIGNING & CONSTRUCTION SUPERVISION OF SCHOOL BUILDING AT UMERKOT |
|
DESIGN OF VARIOUS BUILDINGS, CENTRAL DESIGN OFFICE, AJK |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
CONSULTANCY SERVICES FOR RESIDENT SUPERVISION OF ROADS (142 KM LENGTH), PROVINCIAL HIGHWAY CIRCLE, SARGODHA |
|
CONSULTANCY SERVICES FOR DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF BRIDGE OVER RIVER SOAN, DISTRICT ATTOCK |
|
NHA - CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF LARKANA CITY ROAD PROJECT |
|
DESIGN AND DETAIL SUPERVISION FOR WIDENING AND RE-MODELING OF ROADS, MODEL TOWN SOCIETY, LAHORE |
|
VARIOUS BRIDGES, MAKHI FRASH LINK CANAL PROJECT |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
ADB FUNDED - INSTITUTIONAL REFORM FOR LOWER BARI DOAB CANAL PROJECT. |
|
WORLD BANK FUNDED - CAPACITY NEEDS ASSESSMENT OF MINISTRY OF WATER & POWER |
|
 |
 |
 |
 |
 |
 |
 |
|
|
|
|
|